Accessibility Assessments
Comprehensive surveys evaluate levels of compliance and provides recommendations for jurisdictional requirements.
The K2M team performs accessibility surveys of your facility and site to determine areas of non-conformance to applicable codes. Detailed inspections of building and site elements capture existing conditions and measurements of key conditions of non-compliant items/areas taken. In addition, the team of ADA specialists, architects, and engineers provide recommendations to bring facilities into compliance with supporting detail, technical feasibility, and cost.
K2M will prioritize the recommendations in order of magnitude to bring the facility within the compliance guidelines of the governing accessibility codes. Transition plans are developed for larger institutions where a multi-year budgeting is required. Reports include:
- Code Overview / Executive Summary explaining accessibility requirements and the survey process for each facility, roadway, or project site
- Barrier, Location and Accessibility Code / Code Citation (if applicable)
- Recommended Solutions
- Clarification Codes and Comments for each Recommendation
- Cost per item
- General Priority per the Preamble to the governing accessibility code
- Photos of typical or unique barriers
- Key Plan drawings as appropriate to locate areas of concern
- Written Facility Summaries
- Capability for ongoing database management
Featured Projects

Tri-C ADA Assessment
K2M Design performed Americans with Disabilities Act (ADA) Compliance assessments including cost estimating and 5-year capital planning for Cuyahoga Community College at their Metro, Eastern, and Western Campuses.



Norman Noble
K2M Design has worked together to renovate and transform more than 150,000 SF of renovations.



Monroe Co Admin Space
Monroe County and the K2M team undertook a comprehensive strategic needs analysis and facilities assessment for both the short-term (5 year) and long-term (25 year).



M&T Bank
K2M Design partnered with Haris Design and Construction and M&T Bank to provide and Accessibility Surveys for the M&T Bank throughout the Mid Atlantic.



Hilton Aruba
K2M provided accessibility assessment services for the building and limited site area.



Renaissance Cleveland
For the historic Renaissance Hotel property, K2M performed an Accessibility survey using ANSI 117.1 standards, a historical assessment, an egress analysis, and an exterior assessment of the facade.
Our Clients Say…
"It is a pleasure to work with the K2M Team. The team held to their project timeline, met with the county Superintendents to complete a thorough overview of our structures and land, met with elected officials and department heads to consider our thoughts, concerns and ideas, and delivered options that we are very pleased with!"
Allen County Ohio Board of Commissioners (Jay Begg, Cory Noonan, Greg Sneary)
"The documents and concepts prepared by K2M has proven to be a valuable resource for long term capital planning and implementation. It was apparent from the very start of this endeavor that the vast experience and understanding, as well as local knowledge provided the County and City a valuable resource."
Mike Dever, Cuyahoga County
"It is amazing that year after year this massive assessment gets better and better. We value our partnership with K2M."
Ron Dilustro, NASA PM
"We are very happy with the work performed by K2M Design. The team is very thorough. The timing was excellent and the diligence shown was great. This team has delivered on all of their promises."
Jason Boyd, County Administer, Lake County & Chuck Klco, Building and Grounds Superintendent, Lake County
"Please accept this expression of my deepest appreciation to the members of the Sixteenth Judicial Circuit Court Accessibility Team (K2M Design) for their persistent, meticulous, and hard-working efforts to survey the accessibility of court facilities within your circuit. I recognize the tremendous workload associated with this project, and I am grateful for the energy and resources devoted to this important endeavor."
R. Fred Lewis, Chief Justice, Supreme Court of Florida
"Thank you for the fast turnaround. DVS are happy with the assessments and are using data from them in their current capital request. Not only that, but DVS reported that the K2M inspection staff were very professional."
Joseph Macneil, Planning Manager
K2M on GSA Schedule
K2M Design is a GSA Schedule Contract Holder on the Federal Supply Schedule for Facilities Maintenance and Management (03FAC) Solutions for Real Property.