Evaluate levels of compliance to determine the best course of action

Comprehensive Surveys

K2Mfacility provides Accessibility Assessments which are accurate, unbiased information about the code compliance governing the location. Our ADA experts perform comprehensive surveys of each existing facility, roadway and project site to determine levels of compliance.

Detailed inspection of site elements can include using customized survey forms based on the needs of the client. These surveys capture existing conditions, measurement of key conditions of non-compliant items/areas taken including photographs taken as determined by the project survey team. In addition, the team of ADA experts, architects and engineers provide recommendations to bring facilities into compliance to a level that is complete with supporting detail, technical feasibility, and clearly understood by all stakeholders.

The final report provides recommendations on what you need to do to comply with the current code requirements.  The report will include preliminary budget estimates for all improvements required based upon our evaluation.  Concurrently with the budget estimates, our team will prioritize the recommendations in order of magnitude to bring the facility within the compliance guidelines of the governing accessibility codes.  Transition plans are developed for larger institutions where a multi-year budgeting is required.

Information is reported in a format customized to meet the needs of our Clients.  In short, our team provides:

  • ADA Overview / Executive Summary explaining ADA requirements and the survey process for each facility, roadway, or project site.
  • Barrier, Location and Accessibility Code / Code Citation (if applicable).
  • Recommended Solutions.
  • Clarification Codes and Comments for each Recommendation.
  • Budget Cost per item.
  • General Priority per the Preamble to the governing accessibility code.
  • Photos of typical or unique barriers.
  • Key Plan drawings as appropriate to locate areas of concern.
  • Written Facility Summaries.
  • Capability for ongoing database management.

Our Clients Say…

"It is a pleasure to work with the K2M Team. The team held to their project timeline, met with the county Superintendents to complete a thorough overview of our structures and land, met with elected officials and department heads to consider our thoughts, concerns and ideas, and delivered options that we are very pleased with!"